翻訳と辞書
Words near each other
・ Left to My Own Devices
・ Left to Right
・ Left to Vanish
・ Left triangular ligament
・ Left Turn
・ Left Turn Ahead
・ Left Union
・ Left United Front
・ Left Unity
・ Left Unity (European Parliament)
・ Left Unity (UK)
・ Left Centre
・ Left Coalition (Serbia)
・ Left Coast
・ Left Coast Crime
Left Coast Lifter
・ Left Coast Punk EP
・ Left colic artery
・ Left colic vein
・ Left Column (theater troupe)
・ Left communism
・ Left communism in China
・ Left Communist Youth League
・ Left corner
・ Left corner parser
・ Left coronary artery
・ Left Democratic Front (Kerala)
・ Left Democratic Front (Maharashtra)
・ Left Democrats
・ Left Democrats (Sweden)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Left Coast Lifter : ウィキペディア英語版
Left Coast Lifter

The Left Coast Lifter is a floating derrick barge or sheerleg which was built to assist in the eastern span replacement of the San Francisco–Oakland Bay Bridge. The barge carries a shear legs crane which is the largest barge crane ever used on the West Coast. The barge's name is taken from "Left Coast", a slang term for the West Coast of the United States (which appears on the left side of a typical map and also refers to the region's liberal, or "left leaning", political tradition).
==Operational history==

''Left Coast Lifter'' was built for the American Bridge/Fluor joint venture (ABFJV), which was the lead contractor on the self-anchored suspension eastern span replacement. The barge was built in Portland, Oregon by U.S. Barge, LLC and ferried to Shanghai, where it was fitted with a shear-leg crane manufactured by Shanghai Zhenhua Port Machinery Co. Ltd (ZPMC). The completed sheerleg was ferried back to the United States on a semi-submersible heavy-lift ship, the ''Zhen Hua 22'' (IMO 8106446). The total cost was approximately .
While transporting the sheerleg, the heel pin support may be moved towards the bow of the barge in order to lower the boom and the overall profile of the barge, facilitating transport.
Liftech Consultants assisted ABFJV with design review for the crane, including developing the technical specifications sent to ZPMC. The project received three Excellence in Structural Engineering awards:
* 2010 Award of Excellence for Special-Use Structures, from the Structural Engineers Association of Northern California
* 2010 Award of Merit for Special-Use Structures, from the Structural Engineers Association of California
* 2011 Outstanding Project, from the National Council of Structural Engineers Associations
Before ''Left Coast Lifter'' was fitted out with the crane for bridge construction, it was deemed to violate the Jones Act, specifically in that since the integral crane would be built and installed in China, it could not be used to transport goods by water between U.S. ports. Therefore its first job, prior to installation of the crane, was to haul dredged materials to Long Beach.
After ''Lifter'' arrived at the Bay Area in March 2009, it was used to place pre-fabricated falsework truss sections and the 28 box girder deck sections. Before the heavy deck sections for the Bay Bridge were lifted, the ''Left Coast Lifter'' raised a sunken tugboat in August 2009, USS ''Wenonah''. The first deck section was lifted in February 2010, and the last deck section was lifted in October 2011.
American Bridge/Fluor solicited offers for ''Left Coast Lifter'' in 2012, after the conclusion of its work on the Bay Bridge. A consortium of companies, Tappan Zee Constructors (TZC, a joint venture of Fluor, American Bridge, Granite and Traylor Brothers), purchased the crane barge, which gave them a competitive edge in the bidding process for the construction of the Tappan Zee Bridge replacement across the Hudson River. Reportedly, according to the purchase agreement between TZC and ABFJV, ''Left Coast Lifter'' will be returned to ABFJV once the work on the Tappan Zee Bridge is completed.
Now nicknamed ''I Lift NY'', the barge is still officially registered with the U.S. Coast Guard as the ''Left Coast Lifter''. The crane departed San Francisco Bay under tow in December 2013, transited the Panama Canal in January 2014, and arrived at Jersey City at the end of January. There it was refitted with an upgraded control system before arriving at the job site in October 2014.
The massive crane is being used for heavy lifts of large bridge sections. After building the new bridge, ''Lifter'' will also be used for heavy lifts during the dismantlement of the old structure at that location.